Bills of materials
Components with planned waste, plus labour and overhead lines, and a standard cost if you keep one.
Define what goes into a product, release a production order, complete it batch by batch, and the cost of what you made lands in stock with the variance explained.
Components with planned waste, plus labour and overhead lines, and a standard cost if you keep one.
Planned, released, in progress, completed: instant for simple builds, through work in process for longer runs.
Finish an order in batches; each one moves materials out and finished goods in.
See where actual cost left the standard: materials, labour or overhead.
Take a finished item apart into its components, at cost.
Manufacturing variance, the production register, cost of goods manufactured and material consumption.
Each order draws from one warehouse and puts the finished goods into one.
It fits small and medium workshops. A plant that schedules machines by the hour needs a planning tool beside it.
A workshop's year-end profit, cost of goods manufactured included, is where Oman's income tax begins. The 3% rate needs every condition met, among them an average of no more than 25 employees and gross income up to OMR 150,000, so a growing workshop should watch both. Products sold abroad are zero-rated exports on the VAT return. Aqid ERP costs production at weighted average in rials to three decimals and shows where actual cost left the standard. Production is on Growth and Premium.
Set up for Oman's rules from the first day.