Bills of materials
Components with planned waste, plus labour and overhead lines, and a standard cost if you keep one.
Define what goes into a product, release a production order, complete it batch by batch, and the cost of what you made lands in stock with the variance explained.
Components with planned waste, plus labour and overhead lines, and a standard cost if you keep one.
Planned, released, in progress, completed: instant for simple builds, through work in process for longer runs.
Finish an order in batches; each one moves materials out and finished goods in.
See where actual cost left the standard: materials, labour or overhead.
Take a finished item apart into its components, at cost.
Manufacturing variance, the production register, cost of goods manufactured and material consumption.
Each order draws from one warehouse and puts the finished goods into one.
It fits small and medium workshops. A plant that schedules machines by the hour needs a planning tool beside it.
A workshop that imports components and sells finished goods abroad meets the NBR return at both ends: imports where VAT was paid or deferred at customs sit in purchases, and exported goods go on the zero-rated export line. In between, the production order moves materials through work in process into finished stock at weighted average cost, kept to the fil. Production comes with the Growth plan, at BHD 11.1 a month before VAT, and with Premium, at BHD 22.
Set up for Bahrain's rules from the first day.