Bills of materials
Components with planned waste, plus labour and overhead lines, and a standard cost if you keep one.
Define what goes into a product, release a production order, complete it batch by batch, and the cost of what you made lands in stock with the variance explained.
Components with planned waste, plus labour and overhead lines, and a standard cost if you keep one.
Planned, released, in progress, completed: instant for simple builds, through work in process for longer runs.
Finish an order in batches; each one moves materials out and finished goods in.
See where actual cost left the standard: materials, labour or overhead.
Take a finished item apart into its components, at cost.
Manufacturing variance, the production register, cost of goods manufactured and material consumption.
Each order draws from one warehouse and puts the finished goods into one.
It fits small and medium workshops. A plant that schedules machines by the hour needs a planning tool beside it.
Manufacturing comes with Growth, KWD 9.1 a month, and Premium, KWD 17.9. A bill of materials carries labour and overhead lines beside its components, costed to three decimals of the dinar. If your labour standard assumes the 48-hour week the Labour Law allows, expect it to move in Ramadan, when the limit is 36 hours a week; the variance report shows whether actual cost left the standard on materials, labour or overhead. There is no shop-floor scheduling, so it suits small and medium workshops.
Set up for Kuwait's rules from the first day.